Inside the tank demo / Sample package

See what comes
with the design.

A drawing you can inspect. Quantities you can open. Findings you can trace back to their source.

Download the sample ZIP
EXAMPLE TK-101 · STARTING REVISION21 source files · 2 presentation sheets

Generated from the public tank demo’s invented site inputs. Preliminary and not for construction; no engineer has approved or released this sample. Sources, rates and reports are illustrative.

01 / Design documentation

The detail behind
the decision.

Dimensioned views, connection schedules and site context, drawn from the same demo inputs. Two presentation sheets accompany the original source files.

Open full size
A3 tank general arrangement with dimensioned plan and elevation, nozzle schedule, shell courses and design notes
NF-DEMO-TK101-GA-01 · A3 / 1:100PRELIMINARY · NO ENGINEERING RELEASE

Dimensions and schedules come from the demo’s starting case. Original drawings, IFC models, design basis and exclusions remain in the ZIP. These sheets add presentation detail, not engineering checks.

Read the design basis

Shell schedule / Exact CSV extract

Six shell courses · preliminary quantities
CourseHeight
m
Plate
mm
Mass
kg
1263,551
2252,959
3252,959
4252,959
5252,959
6252,959

The complete CSV retains the sizing basis, exclusions and unconfirmed code references.

02 / Quantities

Take the numbers
with you.

Inspect the shell schedule as an ordinary spreadsheet file. The full set also contains nozzle and tie-in schedules, instrument and cable lists, and an illustrative estimate with its missing inputs visible.

Download the quantities CSV

Placement / 4 recorded findings

CLASH / TK-101 shellScanned object

TK-101 shell shares volume with Scanned object (other).

Source · revision 2026-09
area4-scan.las (example)
What the source cannot show
A scan shows the surfaces the scanner saw: what was behind other objects, inside them or below ground is not in it, and empty voxels may be shadows.
CLASH / TK-101 foundationScanned object

TK-101 foundation shares volume with Scanned object (other).

Source · revision 2026-09
area4-scan.las (example)
What the source cannot show
A scan shows the surfaces the scanner saw: what was behind other objects, inside them or below ground is not in it, and empty voxels may be shadows.
CLEARANCE / TK-101 shellPump P-201

Pump P-201 is 720 mm from the shell, inside the 1500 mm maintenance rule.

Source · revision F
MA-1: Owner standard ST-12 §6 (example)
What the source cannot show
Drawings show what was drawn at their revision: as-built changes, below-ground services and objects nobody drew are not on them, and an object read from them is a box.
NOT SHOWN / TK-101 shellarea

16 plan points within 2 m of the tank are covered by no source: what is there is not shown in the source, and is not taken as empty.

Source · revision F; C; 2026-09
Area 4 layout 100-001 (example); area4-structures.ifc (example); area4-scan.las (example)
What the source cannot show
No source covers these points.

03 / Findings

Know what still
needs an answer.

The starting placement has clashes, a maintenance-clearance finding and gaps in source coverage. Open each finding to see its source and limits.

This is check output, not a signed review. A real assignment needs the named engineer’s review and release under the agreed scope.

Download the findings CSV

Now change the design

See what follows
when the tank moves.

Open the tank demo, choose Placement, then Try a change. Compare the clearance findings and pipe and cable route lengths.

A practical place to start

What would your project need?

Show us the design, what needs to change and the delivery date. We’ll agree the work, files and price.

Bring us a design